Commercial & residential HVAC installation across Northern Virginia and DC

Full system replacement for existing buildings

From one rooftop unit to the whole building, we replace end-of-life equipment in phases planned so your tenants keep running.

New packaged rooftop unit set on a commercial roof, still partly wrapped

What we replace

Rooftop units, VAV systems and split systems in occupied buildings, planned around the people still using them.

Equipment

  • Rooftop units (RTUs)
  • VAV systems
  • Split systems, including unit by unit in apartment complexes
  • Restaurant kitchen exhaust and make-up air

Approach

  • Phased replacements that keep tenants running
  • A single unit or the whole building
  • System design for the replacement, where the layout needs it

Hand-over

  • Equipment start-up and commissioning
Row of rooftop units along the roof of a commercial building

Phasing around your tenants

We plan the replacement in phases, so each part of the building keeps its heating and cooling while the work moves through the rest.

Tell us how the building is used and which areas can't go down. The phasing is planned around that before the bid goes out, so the bid reflects how the work will run.

How a replacement runs

  1. Step 1: Walk the building

    We look at the existing equipment, the ductwork and how the building is used.

  2. Step 2: Plan the phases

    We set out which equipment is replaced in which order, so tenants keep running.

  3. Step 3: Get a bid

    You get a bid for the replacement scope and the phasing behind it.

  4. Step 4: Replace in phases

    Old equipment comes out and new equipment goes in, one phase at a time.

  5. Step 5: Start-up and commissioning

    Each new unit is started up and commissioned as its phase is finished.

System replacement FAQs

Can you replace a system while tenants stay?

Yes. We plan the replacement in phases, so tenants keep running while the work moves through the building.

Do you replace single units or whole systems?

Both. We replace a single rooftop unit or the whole building's system.

Which systems do you replace?

Rooftop units (RTUs), VAV systems, split systems, including unit by unit in apartment complexes, and restaurant kitchen exhaust and make-up air.

Can the work be scheduled outside business hours?

When possible, yes. We'll coordinate scheduling to reduce disruption to your operation.

Do you start up the new equipment?

Yes. We start up and commission the new equipment before it's handed over.

Planning a replacement?

Tell us about the building and its equipment, and we'll come back with a bid.